SOP on cleaning, maintenance and calibration of stability chamber

SOP on cleaning, maintenance and calibration of stability chamber

Objective:

  • To lay down a procedure for Cleaning, maintenance and calibration of stability Chamber.

Scope:

  • This SOP is applicable for the cleaning, maintenance and calibration of stability chamber

Responsibility:

  • QC Chemist or above
  • Electrician or above

Accountability:

  • Head – Quality Control
  • Head – Engineering

Procedure:

stability chamber

Cleaning:

  •  Chamber shall be cleaned from outside daily.
  • Boiler tank shall be cleaned weekly or after maintenance.
  •  Water reservoir tank shall be cleaned weekly or after maintenance.
  •  Boiler heater shall be cleaned weekly or after maintenance.
  •  PT-100 sensor tip shall be cleaned with the help of polish paper in 3 month.
  •  Condensor, condensor motor and radiator shall be cleaned in 3 month with the help of  blowing air.
  • Control panel shall be clean by blowing air in 3 month.
  • Cleaning record of the stability chamber shall be maintained as per Annexure No.  A01

Maintenance :

  • Any problem in stability chamber shall be intimated to Engineering department and fill the maintenance work permit as per Annexure No. A02.
  • Chamber fan and condensor fan shall be checked in three months. If found loose,tighten it.
  • Working of safety cut off shall be checked in 3 month by giving external heat  to the dry bulb sensor.
  • Maintenance shall be done if any problem appears in the chamber.
  • Preventive maintenance of stability chamber shall be done by the service engineer in 3 months and record shall be maintained as per Annexure No. A06.
  • If any abnormality observed by service engineer then action for rectification shall  be done immediately.
  • Water level of the reservoir tank as well as of the main tank shall be checked at the  start of shift and at end of shift.
  • Maintenance record shall be maintain as per Annexure No A02

Calibration:

Calibration of the stability chamber shall be done by outside party once in a year.

Calibration shall be reported as per Annexure No. A02

For Other Pharma Related Post and Updates Click Here 

List of Annexure / Format :

Sr.

No.

Format Title Annexure

Number

1  Stability Chamber Cleaning

Record

A01
2  Stability Chamber Maintenance

Record

A02
3 Stability Chamber calibration

Record

A03

References :

  • If any

Reason for Revision :

  • Not applicable due to first version of SOP

Abbreviation :

  • QC                    :    Quality control
  • SOP                  :    Standard Operating Procedure

 

Annexure 1

Stability Chamber cleaning Record

Stability chamber Id. No.:

Sr.

No.

Date

 

Chamber Boiler

tank

Boiler

Heater

Reservoir

tank

PT-sensor

tip

Condensor Condensor

motor

Chamber

fan

Condensor

fan

Cleaning done  by Checked by

 

Remarks

 

Annexure 2

Stability chamber maintenance record

Stability chamber Id. No. :                                                                   Date :

Stability Chamber Model No. Capacity
 

 

 

 Problem Identified :

Action for rectification :

 Is calibration required after maintenance :

Remark ( if any ) :

Service Engineer ( Sign / Date ) Checked By ( Sign / Date ) Approved By ( Sign / Date )
     
     

Annexure 3

Calibration record of stability Chamber

Stability chamber Id. No.:

Calibration Done On :                                            Next Calibration due On :

Set Temperature Actual Temperature Calibrator Temperature
     
Set RH Actual RH Calibrator RH
     

The above equipment has been found / not found within the permissible limits for temperature ±2°C and for relative humidity ±5% and hence acceptable.

Calibrator Details :

Calibrator No. Detail of Calibrator Calibration Details Calibration due date
       

Remark if Any :

Instrument Calibration comply / does not comply.

Reported By / Date Checked By / Date Approved By / Date

 

For more Pharma posts and updates click Here