FAT OF INSPECTION CONVEYOR

FACTORY ACCEPTANCE TEST  OF INSPECTION CONVEYOR Contents Objective Scope Responsibility Verification of Technical Specification Verification of Material of Construction Verification of Instruments Verification of Operation Verification of  InterLock Machine Trail Sheet Suggestions/  Modifications FAT Closed Out OBJECTIVE: To verify that the machine at the Manufacturer’s site is ready as per the Design Qualifications and in … Read more

DQ OF TURN TABLE

TURN TABLE DESIGN QUALIFICATION Stainless steel Scrambler & Unscrambler, which is familiar as turn table. This is built on MS Square frame, solid guide rail & reduction gear box for jerk less & noiseless performance. Turntable is useful to ensure total synchronization, uniform flow of container and to take a turn at 90 degree to suit … Read more

IQ of AUTOMATIC AIRJET BOTTLE AIR AND VACUUM CLEANING MACHINE

INSTALLATION QUALIFICATION of AUTOMATIC AIRJET BOTTLE AIR AND VACUUM CLEANING MACHINE Contents Pre Execution Approval Objective Equipment Description Participants Log Installation Qualification Checklist Sub-Component CheckList Component Location List MOC Verification List Test / Inspection Reports Utility Verification List Attachment Log Summary, Conclusion, and Recommendation Abbreviations Post Execution Approval OBJECTIVE: Installation Qualification protocol for Automatic Air … Read more

DQ OF INSPECTION CONVEYOR

DESIGN QUALIFICATION OF INSPECTION CONVEYOR  3.1/2” X 5 FT Inspection table is equipment consisting of a three-track conveyor with a hood with lighting arrangement and visual inspection background of alternate black & white color. Inspection table have stainless steel structure with moving SS slat chain. Structure made out of SS square pipe & supported on … Read more

INSTALLATION QUALIFICATIONS OF DISPENSING BOOTH

INSTALLATION QUALIFICATIONS OF DISPENSING BOOTH TABLE OF CONTENT Purpose Scope Responsibilities Procedure Installation Qualification tests Documents & Drawings Verification Verification of Technical Specification for In-House & sub-components / Bought out items Utilities Verification Material of Construction Verification Critical Instrument Calibration Verification Installation Qualification Tests Status Data Analysis, Summary of IQ & Recommendations Amendment Record Conclusion … Read more

Factory Acceptance Test for Blister Pack Machine

Factory Acceptance Test for Blister Pack Machine machine name : BLISTER PACK MACHINE. Client Name & address : M/S BLISCARE MACHINES, MUMBAI. document name : factory  acceptance test PROTOCOL no. : Revision no. : MACHINE SR. NO. : Table of Contents 1.… SYSTEM DESCRIPTION & SALIENT FEATURES :……………………………………………………………. 2.… SYSTEM CHECKS :…………………………………………………………………………………………………………… 2.1 Physical Check … Read more

CLEANING CHECKLIST(BLISTER PACKING MACHINE)

CLEANING CHECKLIST BLISTER PACKING MACHINE  TYPE –A  Check that all the remnants of previous product i.e. PVC / Alu. Foil and Rubber stereo etc .are removed from Machine and its area. Check that all contact parts are cleaned with sufficient quantity of potable water up to 10 minutes. Finally rinsed with sufficient quantity of purified water … Read more

PERFORMANCE QUALIFICATION OF AUTO COATER

NAME OF EQUIPMENT : Auto coater 36 “ MAKE : Samarika Pharma MODEL NO. : EQUIPMENT ID. NO. : DEPARTMENT : Production LOCATION / ROOM ID.NO. : Coating Room PROTOCOL REFERENCE No. : EFFECTIVE DATE : TABLE OF CONTENTS  SR. No. CONTENT PAGE No. 1.0 Qualification Report Pre-approval 2.0 Objective & scope 3.0 Responsibilities 4.0 … Read more

INSTALLATION QUALIFICATIONS OF DISPENSING BOOTH

INSTALLATION QUALIFICATIONS OF DISPENSING BOOTH TABLE OF CONTENT Purpose Scope Responsibilities Procedure Installation Qualification tests Documents & Drawings Verification Verification of Technical Specification for In-House & sub-components / Bought out items Utilities Verification Material of Construction Verification Critical Instrument Calibration Verification Installation Qualification Tests Status Data Analysis, Summary of IQ & Recommendations Amendment Record Conclusion … Read more

PERFORMANCE QUALIFICATIONS FOR RAPID MIXER GRANULATOR

 Protocol Preparation and Approval Preparation and Checking:   Validation Team Prepared by Checked by Dept QC QA Stores Stores QC QA Name             Signature             Date               Approval:    Approved by Plant Head Head- Quality Control Head- Quality Assurance Name … Read more